Work Breakdown Structure Template 1

January 16, 2018 | Author: Anonymous | Category: Business, Project Template, Work Breakdown Structure Template
Share Embed


Short Description

Download Work Breakdown Structure Template 1...

Description

Work Breakdown Structure Project Name: Department: Focus Area: Product/Process:

Prepared By Document Owner(s)

Project/Organization Role

Project Closure Report Version Control Version

Date

Author

Change Description Created document.

Confidential Last printed 4/6/2004 4:07:00 PM

Work Breakdown Structure

Work Breakdown Structure Purpose and Limitations [Replace this text with a statement of the purpose and limitations of this worksheet, or use the following sample.] The purpose of this worksheet is to: 

Identify the work to be done.



Identify the types of resources required for the work.



Develop estimates for each work element.



Identify storage locations.

This worksheet does not address:  Who will perform the work. 

When the work will be completed.

Confidential

Page 2

12/30/2014

Work Breakdown Structure

Work Breakdown Structure Organization Chart

1.0 Automated Software System

1.1 Prime Mission Product

1.1.1 Subsystem 1… (Specify Names)

Confidential

1.2 Platform Integration

1.1.2 PMP Application Software

1.3 Systems Eng/ Program Mgt

1.1.3 PMP System Software

1.4 System Test & Evaluation

1.5 Training

1.6 Data

1.5.1 Equipment

1.5.2 Services

1.5.3 Facilities

Page 3

1.7 Peculiar Support Equip

1.8 Common Support Equip

1.8.1 Test & Measure Equip

1.8.2 Support & Handling Equip

12/30/2014

Work Breakdown Structure

Work Breakdown Structure Worksheet

Work ID

Work Name

Description

Include (Completion Criteria)

Customer

Asset Type

Complexity

Estimated Effort

Skill Required

Dependency

Hand Off To

Storage/Location

1.0 1.1 1.1.1 1.1.2 1.1.3 2.0 2.1 2.1.1 2.1.2

Confidential

Page 4

12/30/2014

View more...

Comments

Copyright © 2017 HUGEPDF Inc.